Split design from construction and you get two contracts and a seam nobody owns. Combine them and you get a budget while the drawings are still moving. Each setup has a catch, and the catches are different.
In design-build, one firm is contracted for both design and construction. With a general contractor, you usually hire a separate designer or architect first, then bid the build. Maksymov Brownstone is a design-build firm, so we have a stake in this question. We will say where we think design-build helps, where a general contractor with a separate designer is the better fit, and how to test either option before you sign.
What does the design-build process look like?
This is our process, from our kitchen remodeling page. It is one example of how a design-build firm can be organized.
- Consultation and planning, with a complimentary estimate. We talk through goals, space and budget.
- Design stage with our designers: floorplan, materials, finishes and 3D renderings. This takes about three weeks per room.
- Estimate and timeline. The itemized cost and schedule arrive once the design is final.
- Construction by one team of general contractors, carpenters and remodelers, with a dedicated project manager giving regular updates.
- Final walkthrough that inspects every finish and joint.
Notice the order. The itemized price comes after the design, not before, because a price on an unfinished design is a guess. The first meeting gives you a preliminary range so you know whether the project is realistic; the itemized estimate is the one you sign.

How do design-build and a general contractor compare?
| Factor | General contractor with a separate designer | Design-build (Maksymov Brownstone) |
|---|---|---|
| Contracts | Two (designer, contractor) | One |
| Who is accountable if design and build conflict | The owner coordinates two parties | One team manages design, permits and construction; we say there are no gaps in responsibility (kitchen page) |
| When price is known | After drawings are bid | A complimentary estimate at the first consultation; itemized cost and timeline once the design is final |
| Change-order risk | Changes after bidding are priced separately | Written change order before work proceeds; we advise a 10–15% contingency (cost guide) |
| Permits and inspections | Coordinated by the contractor or the owner | We handle permits and inspections |
| Warranty | Varies by contractor | Written 3-year workmanship warranty (warranty page) |
A change order is a written agreement to change the scope or price of the work after the contract is signed. It is normal on remodels. What matters is whether it is written down before the work happens.
Which one suits a high-end kitchen?
The more the design and the construction depend on each other, the more design-build helps. Moving a wall, planning custom cabinetry around a new layout or choosing slab stone that needs a structural check are all decisions where an architect’s drawing and a carpenter’s reality should meet before the money is spent. Our team includes an architect (Mark Trembach) and in-house designers, and produces 3D renderings and a written specification book (design page).
A general contractor with a separate designer works well in two cases. You already hold a finished design. Or you have an independent designer you trust and want at arm’s length from the builder, as a second set of eyes on the contractor’s work. Neither route removes your job. In both, get the scope, price, schedule and change-order process in writing.
One practical test: ask each firm what happens when the drawing and the site disagree. A good answer names a person, a document and a deadline.
What do clients say about working with one team?
“We worked with their designer who was friendly, highly experienced and invaluable in guiding our decisions; she met us multiple times at showrooms and created beautiful renderings to help us visualize the final project.”
Julia G., June 2026, Google review
A second client, Michael M. (November 2025, Google review), wrote: “They offer design and architectural services if you yourself don’t have a finalized design. It’s a full service shop.”

What does Washington law say?
All construction contractors in Washington must be registered with the state Department of Labor & Industries (L&I), bonded and insured. A general contractor may hire subcontractors across several specialties. A specialty contractor works only in its registered specialty and cannot hire subcontractors. Electrical, plumbing and some other trades need separate licensing (L&I, Register as a Contractor).
A design-build firm follows the same registration rules, so check any firm, ours included, in L&I’s Verify tool. We list ten more checks in 10 questions to ask a luxury remodeling contractor.
What do homeowners actually hire?
Houzz’s 2026 Kitchen Trends Study (1,780 homeowners, self-reported) shows who renovating homeowners bring in:
| Professional | All renovating homeowners | Spending $50,000 or more |
|---|---|---|
| At least one professional | 87% | 98% |
| General contractor | 48% | 60% |
| Kitchen designer | 22% | 34% |
| Design-build firm | 13% | 18% |
| Interior designer | 12% | 13% |
| Architect | 11% | 13% |
Source: Houzz PDF.
The pattern is worth noticing. As spending rises, every category rises, and the kitchen designer category rises most in relative terms (22% to 34%). Design help is becoming the norm on bigger projects, whichever contract structure you choose.
Is design-build cheaper or faster?
The famous study (Konchar and Sanvido, Penn State and the Construction Industry Institute, 1998, 351 projects) found design-build unit cost about 6% lower and construction speed at least 12% faster than design-bid-build, as ACHR News reported. Treat it as context only. Later studies found no significant difference in some samples, and these studies cover mostly commercial and institutional projects, not home kitchens. We do not offer it as proof for yours.

How do you decide?
If these are mostly true for you, design-build is likely a fit:
- You have not finalized a design, or you want one team to draw and build.
- You expect to change the layout, move a wall or plan custom cabinetry.
- You would rather have one contract and one person to call than coordinate two firms.
If these are mostly true, a general contractor with a separate designer is likely a fit:
- You already have a finished design from an architect or designer you trust.
- You want an independent professional reviewing the builder’s work.
- You are comfortable coordinating two parties and resolving conflicts between them.
Next step
To see how the five stages would apply to your kitchen, book a complimentary consultation. Start on our kitchen remodeling page.